Shared party wall between two adjoining brick terraced houses with scaffolding erected for a rear extension

Agreements  |  Disputes  |  Resolution

The party wall, settled properly
before the first brick moves.

The Party Wall etc. Act 1996 exists to prevent and resolve problems between neighbouring owners over shared walls, boundary walls and excavation. We handle that framework end to end — clearly, quickly and on a fixed fee wherever possible.

  • 30+ yearsCombined experience
  • NationwideService coverage
  • Fixed feesWherever possible
  • FPWSGoverned surveyors
Reliable. Trusted. Experienced. Loft & basement conversions Extensions Piling & underpinning New residential & commercial developments

Which side are you on?

Two owners. Two very different sets of questions.

The Act treats the person doing the work and the person living next to it differently. Find your position below — then talk to a surveyor who has handled hundreds of both.

Building / Property Owner

Planning work on your property and unsure whether a party wall notice is required? We remove the guesswork before your programme slips.

  • We confirm whether your building project falls under the Party Wall Act.
  • Clear, truthful advice — including when you don't need us.
  • Fixed fees for compliance with the party wall act.
  • Process-management software and electronic service to keep notices moving and prevent delays to your project.
  • Drafting and service of Party Structure, Line of Junction and Adjacent Excavation notices.
Read about Section 2 party structure notices

Adjoining Property Owner

A notice has landed on your mat and you're not sure where you stand, or what a 14-day deadline actually means. We'll explain your options in plain English.

  • Expert advice on consenting, dissenting or serving a counter notice.
  • All fees are normally met by the building owner carrying out the work.
  • A schedule of condition recording your property before work starts — your evidence if damage occurs.
  • Appointment as your surveyor, or as the agreed surveyor for both parties.
  • Neighbour already started without serving notice? Contact us today for advice.
Have you received a party wall notice?

Party Wall Guide

The two sections that catch most projects

Section 2

Work to an existing party structure

A Party Structure Notice is required where you intend to work on a wall, floor or partition shared with a neighbour. Typical triggers:

  • Cutting in beams or flashings for a loft conversion
  • Removing a chimney breast or old fireplace
  • Underpinning or supporting the base of a shared wall
  • Raising the height, thickness or depth of a party wall
  • Demolishing and rebuilding part of a party structure

Notice must be served on every adjoining owner — freeholders, landlords and long leaseholders included.

Section 2 explained

Section 6

Excavation near a neighbour's building

An Excavation and Construction Notice is required when you dig close to, and below the foundations of, an adjoining structure.

  • Within 3 metres and deeper than the neighbour's foundations — most domestic extensions
  • 3 to 6 metres for deeper work such as basements
  • Applies to garden walls and shared party fence walls too
  • Plans showing site, depth and new structures must accompany the notice
  • Serve at least one month before work starts

Recipients have 14 days to consent. Silence counts as a dispute, and surveyors must then be appointed.

Section 6 explained
Excavation trench exposing the footings of an old brick boundary wall, with a tape measure resting on the brickwork

Why the depth matters

Digging close to a wall changes the risk, not just the paperwork.

Excavation near an existing structure can undermine foundations and open the door to claims for damage. The closer and deeper you dig, the higher the risk — which is exactly why the Act asks for plans, protection measures and a recorded baseline before a spade goes in.

Our surveyors have practical experience across construction disciplines, so we highlight the issues that actually matter rather than padding out a report. Where safeguarding is needed, it's written into the award.

Understand the 3m and 6m rules

How it runs

From first call to signed award

Most straightforward matters move through these five stages. We use electronic communication and process management software throughout to accelerate the party wall process and avoid construction delays.

  1. 01

    Assessment

    We review your drawings and confirm whether the Act applies, which sections bite, and who must be served. If no notice is needed, we tell you plainly.

  2. 02

    Notices served

    Correctly drafted notices with the required particulars, plans and start date — served on every adjoining owner within the statutory timescales.

  3. 03

    Consent or dissent

    Written consent lets work proceed. A counter notice or dissent moves the matter to the dispute-resolution route, with surveyors appointed.

  4. 04

    Schedule of condition

    A photographic record of the adjoining property before construction begins — the evidence that settles later arguments about pre-existing cracks.

  5. 05

    Party Wall Award

    A binding document setting out authorised works, working hours, access rights, protection measures and what happens if something goes wrong. Appealable at the County Court within 14 days of service.

“Highly recommend, they acted quickly and professionally — we had a great end result.”

MarkBirmingham

Reliable. Trusted. Experienced.

About Party Wall Solutions

We take pride in our adaptability and our personal interest in meeting the needs of our clients. Party Wall Solutions is a growing team of surveyors with extensive experience, ability and knowledge across building surveying, with a sharp focus on party wall matters.

Our surveyors are governed by the Faculty of Party Wall Surveyors and carry professional indemnity insurance. Our fees are always fair, and we aim to keep good relations with clients during the project and long after it — which is why we quote a fixed fee wherever the work allows it.

If you want a knowledgeable and versatile approach to your property matters, call Party Wall Solutions.

More about our surveyors
Governed by
Faculty of Party Wall Surveyors
Insurance
Professional indemnity cover
Advice covers
Basements, lofts, extensions, piling, underpinning, new developments
Support
Unlimited, for the life of your matter

Common questions

The questions we're asked every week

What actually counts as a party wall?

A shared wall or structure owned by two or more different owners — the wall dividing two terraced houses, a masonry boundary wall in a garden, or a floor and partition separating flats. Wooden fences are not party walls; brick, stone and concrete garden walls on a boundary generally are.

What happens if my neighbour consents?

If they give written consent after receiving the notice, the matter can proceed without appointing surveyors. We'd still recommend a schedule of condition so both parties have an agreed record of the property before work starts.

And if they don't consent?

A formal dispute-resolution process under the Act begins. Each party can appoint their own surveyor, or both can agree on a single agreed surveyor. Where the two surveyors cannot agree, a third surveyor is selected to decide the point.

Who pays the surveyor's fees?

Normally the building owner carrying out the work, though this can depend on the agreements between the parties and the circumstances of the case.

What if work has already started without a notice?

Working on a party structure, or excavating within the specified limits, without first serving notice is a breach of the Act and can be prosecuted. An injunction can be sought from the County Court — take advice first, and call us today so we can look at your position.

Can the Act be used to stop my neighbour's work?

No. The Act grants the building owner legal rights to carry out work on the party wall and near your property. Objections on design or amenity grounds belong in the planning-consent process, not the party wall process.

Read all party wall FAQs

Speak to one of our team

Take action to protect your property.

Our dedicated team of surveyors can advise on all party wall issues, nationwide, with unlimited support. Tell us whether you're starting an agreement, responding to a notice, or need calling back as soon as possible.

Call 0330 010 0075